HVAC modernisation at iconic downtown building
Future2 is delivering a complete design & build HVAC and BMS solution at Myslbek as part of a major ongoing modernisation process. The project started with HVAC performance measurement and troubleshooting, then design and installation of new high efficiency Air Handling Units (AHUs), and connection/optimisation of the BMS and energy meters.
The results will dramatically reduce year-round energy consumption by 30-40%, reduce maintenance costs and optimise indoor air quality.